Our Main Components Team at adamas have been in action again.
This time at Winscales Wind Farm in Cumbria where we recently completed the challenging task of replacing a generator on one of the turbines.
This success was made possible by the skilled planning, meticulous coordination, and extensive technician experience that our entire team bring to every project. Their expertise ensured that the replacement was executed seamlessly, minimising downtime and maximising efficiency.
We understand the critical importance of maintaining the turbines that we look after under long term O&M contracts in low production periods to ensure the reliability of our operations in high production periods.